Open pit mines have very high economic and operational risk because of high rate of production and using large scale instruments. So, it is necessary to guarantee the availability of the operational equipment. First stage of mining in these mines is drilling for blasting operation and the availability of related machines has direct effect on all subsequent operations and consequently on overall economy of the operation. Today, operation conditions and machines availability can be assessed and analyzed due to development of reliability methods in different engineering fields. Markov method is one of the potent methods in this context which is based on stochastic process theory. In this study, reliability of rotary drilling machines in Golgohar Mine No. 1, Sirjan, is analyzed using this method. In this way, reliability is calculated by investigating failure dad of these machines during 5 years and modeling different conditions of their availability. So, at least 2 machines will be ready and available for drilling operation with the probability of 95.42% corresponding to 347 days out of total 363 working days.

Keywords

Main Subjects


[1] محقر ع، حسینی م، بهرامی ح (1394) بیشینه­سازی قابلیت اطمینان تجهیزات شبکه­ی انتقاال برق از طریق بهینه­سازی زمان­بندی سرویس تعمیر و نگه­داری با استفاده از الگوریتم مورچگان. نشریه علمی پژوهشی مهندسی صنایع و مدیریت شریف 36-29 :(1)31-1.
 [2] حسینی س‌هـ (1390) مدل‌سازی و شبیه‌سازی قابلیت اطمینان درام شیرر در معادن جبهه‌کار طولانی مکانیزه- مطالعه موردی: معدن زغال‌سنگ طبس. رساله دکتری، دانشگاه صنعتی شاهرود.
[3] Levkovich PE, Chalenko NE (1969) Use of reliability theory to calculate the required number of reserve longwall faces. J Min Sci+ 5(2): 160-165.
[4] Samanta B, Sarkar B, Mukherjee S (2004) Reliability modelling and performance analyses of an LHD system in mining. J S Afr I Min Metall 104(1): 1-8.
[5] Barabady J (2005) Reliability and maintainability analysis of crushing plants in Jajarm Bauxite Mine of Iran. Paper presented at the Reliability and Maintainability Symposium. Proceedings, Annual.
[6] Gupta S, Ramkrishna N, Bhattacharya J (2006) Replacement and maintenance analysis of longwall shearer using fault tree technique. Min Technol 115(2): 49-58.
[7] Gupta S, Bhattacharya J (2007) Reliability analysis of a conveyor system using hybrid data. Qual Reliab Eng Int 23(7): 867-882.
[8] Yang D, Li J, Ran L (2008) Research on reliability of complex coal mine ventilation networks. Wireless Communications, Networking and Mobile Computing, WiCOM'08. 4th International Conference on.
[9] Sharma G, Haukaas T, Hall R A, Priyadarshini S (2009) Bayesian statistics and production reliability assessments for mining operations. Int J Min Reclam Environ 23(3): 180-205.
[10] Uzgoren N, Uysal O, Elevli S, Elevli B (2010) Reliability analysis of draglines'mechanical failures. Eksploatacja i Niezawodnosc-Maintenance and Reliability (4): 23-28.
[11] Kumar Behera D, Sarkar A, Behera A (2011) Reliability investigation for a fleet of load haul dump machines in a mine. IJARCSMS 11(2): 186-194.
[12] Jalali S, Forouhandeh S (2011) Reliability estimation of auxiliary ventilation systems in long tunnels during construction. Safety Sci 49(5): 664-669.
[13] Wijaya A R, Lundberg J, Kumar U (2012) Downtime analysis of a scaling machine. Int J Min Reclam Environ 26(3): 244-260.
[14] Gustafson A (2013) Automation of Load Haul Dump machines comparative performance analysis and maintenance modeling. PhD Thesis, Lulea University of Technology, Sweden.
[15] Moniri Morad A, Pourgol-Mohammad M, Sattarvand J (2014) Application of reliability-centered maintenance for productivity improvement of open pit mining equipment: Case study of Sungun Copper Mine. J Cent South Univ T 21(6): 2372-2382.
[16] Mouli C, Chamarthi S, Gȧ R C, Vȧ A K (2014) Reliability modeling and performance analysis of dumper systems in mining by KME method. IJCET (2): 255-258.
[17] مرشدلو ع، دهقانی ح، بهرامی ح (1394) تحلیل قابلیت اطمینان دستگاه ناوزنجیری زرهی در معدن زغالسنگ مکانیزه طبس. نشریه علمی پژوهشی مهندسی معدن 9-1 :(26)10.
[18] منیری­مراد الف، ستاروند ج، بهرامی ح (1394) بهینه­ سازی تخصیص قابلیت اطمینان برای سیستم تولید معدن روباز با استفاده از الگوریتم ژنتیک. سومین کنفرانس معادن روباز ایران، کرمان، دانشگاه شهید باهنر.
[19] رضایی ز، جلالی س‌م‌الف، سرشکی ف (1391) بررسی اثر حرکت لوکوموتیو معدنی بر قابلیت اعتماد شبکه­های تهویه معادن زیرزمینی (مطالعه موردی: معدن زغال تخت). نشریه علمی پژوهشی مهندسی معدن 13-1 : (14)7.
[20] Birolini A (2007) Reliability engineering. 5th edn. Springer, New York.
[21] Wang H, Pham H (2006) Reliability and optimal maintenance. Springer, New York.
[22] بیلینتون ر، آلن ر (1390) قابلیت اطمینان سیستم­های مهندسی. ترجمه: محسن رضاییان، انتشارات دانشگاه صنعتی امیرکبیر، چاپ دوم.
[23] Papoulis A (2002) Probability, random variables and stochastic. McGraw-Hill, Europe.
[24] جلالی س‌م‌الف، حسینی س‌م‌ع، نجفی م (1388) برآورد تعداد کارگاه­های استخراج ذخیره در معدنکاری زیرزمینی با استفاده از فرآیندهای تصادفی. نشریه علمی پژوهشی دانشگاه صنعتی امیرکبیر 52-45 :72.
[25] Jalali SME, Hoseinie SA, Najafi M, Ameri M (2008) Prediction of confidence interval for the availability of the reserve stops in the underground mining using markov chains. In: 5th International Conference and Exhibition on Mass Mining, Lulea, Sweden, 285-290.
[26] عطایی م (1377) طرح پژوهشی تعیین مدل توزیع عیار در آنومالی شماره 3 معدن سنگ آهن گل‌گهر. شرکت معدنی و صنعتی گل‌گهر سیرجان.